|

Ruskin Dam Seismic Upgrade - Slope Bioremediation


Mission, B.C.

B.C. Hydro’s seismic upgrading of Ruskin Dam will cause a large cut slope immediately above Wilson Road, which is highly visible from the publicly accessible dam. CBA is using a bioengineering approach to restore the vegetation on the slope; services include preliminary and detailed design, and design services during construction.

Article on Ruskin Dam click here.


Copyright © 2008 Catherine Berris Associates Inc.
Vancouver, BC

604-736-6336  |   office@cbainc.bc.ca